Nine categories, in the order a project meets them. Every service opens into the exact tasks it carries and who does each one — Axis, the builder interface, or you. This is the scope a fixed fee is computed from: nothing here is a percentage that firms up later.
Choose one to bring forward the sections that carry your work. Choose it again to see everything.
Before money moves: what the project is, who decides, and what it must return.
Take a structured brief covering the client's objectives, intended exit or hold strategy and reporting expectations, and document the ownership, financier and decision-maker structure behind the project.
Axis does it 4
Secure written authority to act with consultants, council, other authorities, the builder and the building surveyor, and agree and document the confirmed scope, authority limits and fee basis of the appointment so every instruction issued on the client's behalf traces back to a recorded mandate.
Axis does it 4
Produce the plan the project will be run to: a preliminary project execution plan, a consultant responsibility matrix, a register of every client decision the project will require, and an authority approvals tracker, together with a mobilisation programme for the first 30, 60 and 90 days.
Axis does it 5
Issue a document request schedule and collect the complete project record: planning permit and endorsed plans, consultant reports across all disciplines, title and subdivision documents, surveys, geotechnical and environmental reports, services and utility information, leases and occupation arrangements, existing consultant appointments and fee proposals, and the current budget, feasibility, valuation and funding assumptions.
Axis does it 12
Assess the collected due diligence record and produce the project risk register that delivery decisions are tested against, together with the schedule of long-lead investigations that must start early to protect the tender programme.
Axis does it 5
Maintain the project feasibility model as the single commercial reference for the development, re-run monthly from actual costs and current forecasts as delivery progresses.
Axis does it 2
Produce the whole-of-project development budget, taking the quantity surveyor's construction cost as its base and building onto it the consultant fee budget, authority fees and contributions, and the contingency strategy that sits behind the number.
Axis does it 5
Prepare the master development programme covering design, approvals, procurement, construction, commissioning and realisation, including the funding drawdown timing the feasibility rests on, and maintain it as the single time reference for the project.
Axis does it 2
Give the client board a project it can direct: objectives, performance standards and decision rights settled at engagement.
Axis does it 3
Every permit condition owned, every authority interface run, nothing discovered at inspection.
Read the planning permit end to end and build a condition compliance matrix that classifies every condition by its trigger point — before endorsement of plans, before building permit, before commencement of works and before occupation — together with permit expiry dates and any applications needed to extend the permit before it lapses.
Axis does it 6
Prepare a condition responsibility matrix that allocates each permit condition to the consultant or party who must discharge it, and issue a monthly planning compliance status report showing what has been discharged, what falls due next and what is at risk.
Axis does it 2
Assess the developing design against the permit's technical and operational conditions — approved use, hours, patron numbers, parking, bicycle and loading provisions.
Axis does it 6
Determine what the permit conditions require of the builder before and during construction — waste management, traffic management and loading arrangements, the construction management plan council requires, and dilapidation, protection works and neighbour notification obligations — and test them against the contractor's assumptions.
Axis does it 4
Assess every proposed design or commercial change against the planning permit and determine whether it can proceed under the existing approval or requires an amendment, before the change is committed.
Axis does it 1
Where a proposed change carries material amendment risk, engage and manage specialist town planning advice on the amendment pathway — whether a secondary consent, an amended permit or a fresh application is the right route — before the change is committed.
Axis coordinates 1
Manage the building permit application with the building surveyor through to the permit's issue, including acceptance of the fire engineering report, and manage the statutory steps that must precede work near neighbouring property: protection works notices and dilapidation surveys of adjoining buildings and public assets.
Axis coordinates 5 · Axis at the builder interface 3
Axis runs the project's external relationships during delivery: we maintain the stakeholder and approvals registers, handle council and building surveyor communications, coordinate water, power, gas and telecommunications connections, and manage adjoining owner contact and public notices.
Axis does it 7
Marshal the compliance certificates the building surveyor requires — structural, civil and geotechnical completion, facade and waterproofing, accessibility, and essential safety measures — and work through the occupancy permit requirements with the building surveyor so nothing on the project's side holds up the permit when the building is ready to occupy..
Axis coordinates 5
Axis coordinates the evidence trail showing that what is built matches what was approved.
Axis coordinates 3
Axis manages the systems that keep the client's environmental obligations evidenced through construction.
Axis coordinates 3
The consultant team appointed, coordinated and held to the brief, the budget and the code.
Procure and appoint the consultant team on the client's behalf: each discipline's scope of services, deliverables and fee basis defined.
Axis does it 4
Chair the design kick-off with the full consultant team and lock the design brief: floor-area targets, the leasing strategy the commercial workstream has set, and the operational requirements the building must meet.
Axis does it 2 · Axis coordinates 2
Manage the architect and the structural and civil engineers through design development, from the approved permit drawings to documentation a contractor can price, including the facade, roof plant, basement and landscape packages.
Axis coordinates 7
Coordinate the hydraulic, mechanical, electrical, fire protection, lift and communications designs so plant space, riser allocations, authority supply and tenant capacity are resolved on paper before tender.
Axis coordinates 6
Coordinate the fire engineer and the access consultant to settle building-code compliance before tender, including any fire-engineered performance solutions and disability-access requirements.
Axis coordinates 2
Run structured reviews before tender goes out: a buildability workshop where a builder or early-contractor partner is engaged, a clash review at which the services engineers and architect walk the coordinated design and resolve conflicts on record, and a value management session that prices options to bring cost back toward budget without cutting what the design has to deliver.
Axis does it 2 · Axis at the builder interface 1 · Axis coordinates 1
Set the design freeze date and put a change control process in place so late changes are priced and approved rather than quietly absorbed.
Axis does it 2
One number that holds: cost planned, controlled, reported and reconciled to the feasibility and the facility.
Engage and manage a quantity surveyor on the client's behalf and coordinate formal cost plans at design development stage and pre-tender, including escalation allowances and market testing assumptions.
Axis coordinates 4
Review every design change against the current cost plan and maintain a register of value-management options ready to deploy if the budget comes under pressure.
Axis does it 4
Build the commercial control framework the project will run under: the cost code structure, the variation approval protocol, the contingency drawdown protocol and the register of provisional sums and prime cost allowances.
Axis does it 4
Design the monthly cost report and build the commercial dashboard that shows budget, commitments, spend and forecast final cost on one page.
Axis does it 3
Prepare the financing milestone cashflow, the drawdown curve and a monthly funding requirement forecast, so the client and their financier can see, month by month, when money will be needed and how much.
Axis does it 3 · Axis coordinates 1
Maintain a live register of the tripartite agreement's obligations — step-in rights, notice requirements and reporting duties — built from the client's legal advice on the deed, together with a register of funder consent triggers, so any variation or extension of time that crosses a consent threshold is flagged to the client and the financier before it goes for approval..
Axis coordinates 1 · Axis does it 1
Support the raising of the project's debt: lender information packs assembled from the live feasibility and programme, facility term sheets compared on like terms, and lender selection supported through to credit approval.
Axis does it 1
Axis hosts the inspections and prepares the information packs that keep the capital side of the project moving: the financier's quantity surveyor for drawdown certification, valuer inspections, and insurer requirements — compiling the construction information insurers ask for and closing out their inspection conditions.
Axis does it 4
The right builder, on a contract whose every clock and clause the record already knows.
Assess the procurement routes open to the project — design-and-construct, construct-only, early contractor involvement and managed forms — and prepare a recommended contract model and risk allocation that fits the design status, budget and funding conditions.
Axis does it 5
Prepare the complete tender package: the tender documents, returnable schedules and a tender programme that gives builders enough time to price the project properly.
Axis does it 3 · Axis coordinates 1
Run the live tender from issue to close.
Axis does it 3 · Axis at the builder interface 2 · Axis coordinates 1
Assess every returned tender line by line: exclusions, qualifications and departures.
Axis does it 6 · Axis coordinates 2
Prepare post-tender clarification questions, negotiate the preferred builder's offer on price, programme, departures and value-management items, and produce a tender recommendation report stating which builder to appoint, at what price and on what conditions.
Axis does it 2 · Axis at the builder interface 1 · Your decision 1
Determine the contract form — Australian Standard or amended — and define the commercial positions the contract must carry: security, retention and bank guarantees.
Axis does it 7 · Axis coordinates 1
Before the builder takes the site, review the builder's construction programme, procurement schedule and long-lead strategy, site logistics plan, safety, environmental and quality management plans including inspection and test plans, and the community and neighbour communication plan — and coordinate the site possession protocol.
Axis at the builder interface 8 · Axis does it 1
On site every week; claims, variations, time and the statutory payment clock administered to the day.
Axis acts as the client's representative on site through construction: we chair weekly site meetings, run fortnightly consultant coordination sessions, and inspect the works regularly.
Axis does it 8
Axis monitors delivery against the contract programme: we review the builder's two-week and six-week lookahead programmes, track the critical path and float consumption, and maintain a running position on liquidated damages exposure.
Axis at the builder interface 3 · Axis does it 2 · Axis certifies 1
Axis manages the flow of technical information between the builder and the design team during construction: requests for information are monitored against response deadlines, and shop drawings, samples and material approvals are tracked through registers so nothing sits unactioned.
Axis does it 3 · Axis at the builder interface 1 · Axis coordinates 1
Axis administers the commercial side of the building contract.
Axis does it 3 · Axis at the builder interface 2 · Axis certifies 1
Axis runs the statutory payment clock on the construction contract from award to final account.
Axis does it 5 · Axis coordinates 2 · Axis certifies 1
Axis takes the superintendent role under the building contract and manages the dual role openly.
Axis does it 2 · Axis coordinates 1 · Axis certifies 1
Axis chairs the monthly project control group and produces the monthly report set — cost, programme, risk and an executive summary — giving the client one clear picture of position, forecast to complete and open issues.
Axis does it 6
Separate from project cost reporting, Axis reports its own management performance to the client every month against a measure set agreed at engagement: response turnaround, decision latency, cost variance and payment claim compliance.
Axis does it 3
Landlord works, tenant works and the loose fit-out landing inside one programme, not after it.
Coordinate the tenancy split strategy and the boundary between landlord works and tenant fitout, driving the architect's documentation from the leasing requirements, so the shell the builder prices matches the deals the leasing campaign is doing.
Axis coordinates 6
Axis prepares tenancy delivery briefs and coordinates committed tenants' fitout requirements with the builder, so tenant works land inside the construction programme rather than after it.
Axis does it 2 · Axis coordinates 1
Take the furniture, fittings and equipment from a requirements brief and budget through a master item list and specifications, supplier options and procurement with cost-and-gap analysis, approvals and quality control, installation coordinated into the builder's commissioning programme, and handover into the asset register with warranties and whole-of-life assessments — so the fit-out lands with the building instead of after it..
Axis does it 4 · Axis coordinates 1 · Axis at the builder interface 1
Keep the revenue side moving with the build: sales and leasing agents briefed from live project data, campaign milestones aligned to the programme, and marketing claims kept consistent with what the project record actually supports.
Axis does it 2
Commissioned, certified, occupied, defects run to ground, final account closed — where the money is actually decided.
Prepare the commissioning strategy and programme for the building's services, then drive the contractor's testing through to certified results — integrated services, fire mode, lifts, generators and switchboards, mechanical balancing, hydraulics, sprinklers and detection — witnessing tests and holding the contractor to the programme until testing is complete and the results are certified..
Axis at the builder interface 9 · Axis does it 1
Conduct pre-completion defects inspections, bring the design consultants through for their own inspections, and manage the builder's rectification programme, then arrange and run the practical completion inspection.
Axis does it 2 · Axis at the builder interface 2 · Axis coordinates 1 · Axis certifies 1
Collect and verify everything needed to run the building — as-built drawings, operation and maintenance manuals, the asset and warranty registers, spare parts and attic stock, keys and access credentials — then run an operational readiness check and have the builder's specialist trades train your building manager before occupation.
Axis at the builder interface 6 · Axis does it 3
Maintain the defects register through the defects liability period and run the 30-day, three-month, six-month and twelve-month reviews.
Axis does it 7 · Axis at the builder interface 3
Assess the builder's final variation submissions and negotiate the final account with the builder alongside the quantity surveyor — most project management appointments end at practical completion, and this service keeps you represented through the period where cost disputes are actually decided.
Axis at the builder interface 3 · Axis certifies 1
Produce the final cost report and a close-out report recording what the project cost against budget, how it ran and what should carry into your next project, then hand over the complete project record — final as-built drawings, updated operation and maintenance manuals and the full document archive — as one organised set..
Axis does it 4 · Axis at the builder interface 2
Coordinate the end-game so completions land in the right order: purchaser settlements, financier discharge and owners-corporation handover sequenced against practical completion and title, with every party working from the same dates.
Axis does it 1
Run the joint venture's operating rhythm so partners decide on time and fall out never starts by accident: the decision and reporting protocol executed to its cadence, and a live obligations register tracking each party's contributions, funding priorities and the triggers that matter — defaults, exits, dilution.
Axis does it 2
For a financier or as the independent party — never on a project where Axis already acts for the owner.
Act for the financier, not the owner: review cost-to-complete, programme and the contract position before the first drawdown.
Axis does it 3 · Axis certifies 2
Sit between the parties as the independent certifier: the appointment, protocol and information rights settled with everyone by deed.
Axis does it 2 · Axis certifies 2
An instruction is logged when it is given, with its evidence. A permit condition is owned when the permit is read. A claim starts a clock the moment it is served. Nothing is reconstructed later from emails.
The monthly report, the gate packs, the board pack and the final account are generated from the live record. The hours that used to assemble them go to judgement instead.
Computed from exactly this scope. Scope changes are priced in writing before work moves; the fee tile reads movement since signing, and it reads zero until you change something.
Owner, development manager, project manager and site each see the same record through their own door. The builder gets a narrow window to submit claims, RFIs, variations and programme — the clocked objects — and nothing else.
Catalogue extension v3 (2026-09-09), four jurisdictions (VIC · NSW · QLD · ACT). Standalone appointments are never combined with an owner-side engagement on the same project. Statutory clocks run only after each state's rule pack is legally verified. Fee schedules are prepared per engagement and are not shown here.